Concrete

Concrete Footing Calculator

Estimate concrete for strip and isolated footings. Group identical footings, combine different sizes, and review the total in cubic yards, cubic feet and cubic meters.

Created and Written by: Designation: Founder

Technically reviewed by: Riya Kulkarni | BE Civil Engineer

Your footing schedule

Enter dimensions from your footing plan. Unit changes convert the entered measurements. Use decimals, such as 12.5 inches.

Footing groups
Group 1

Use net lengths so corners and intersections count once. Width and thickness must be constant along each run. If length already sums all identical runs, set quantity to 1.

Applied once to the combined footing volume. Adjust the 5% example for your site and supplier.

EXAMPLE ESTIMATE
3.111 yd³

Concrete volume including allowance

Equivalent cubic feet
84 ft³
Equivalent cubic meters
2.379 m³
Base footing volume
80 ft³
5% waste allowance
4 ft³
Footings / runs
1

Footing schedule

  1. Group 1 · Strip footing1 × 80 ft³ = 80 ft³

Display rounded to 3 decimals; calculations use unrounded values. Confirm ordering increments with your supplier.

Concrete footing quantity takeoff

Enter the concrete dimensions from your footing schedule. Use separate groups for different footing sizes or types, and enter the number of identical runs or footings in each group. Results include a per-group breakdown and a combined allowance.

Footing volume formulas

Strip footing: net run length × constant width × concrete thickness × identical runs. Rectangular isolated footing: length × width × thickness × identical footings. Circular isolated footing: π × diameter² / 4 × thickness × identical footings.

Add the group volumes to get the base quantity. Total with allowance = base × (1 + allowance / 100). Use the concrete thickness, rather than the total excavation depth or depth below ground.

Worked example: strip plus isolated footings

A 40 ft net strip run, 24 in wide and 12 in thick, contains 40 × 2 × 1 = 80 ft³. Four isolated footings, each 4 ft × 4 ft × 12 in, add 4 × 16 = 64 ft³. Base volume is 144 ft³. A 5% allowance adds 7.2 ft³, giving 151.2 ft³ = 5.6 yd³ = 4.282 m³.

Count strip intersections once

Lengths must describe non-overlapping concrete. For a rectangular footing ring with an outside footprint of 20 ft × 12 ft and a uniform 2 ft width, count the two 20 ft strips plus two clear 8 ft strips: net length = 56 ft. At 1 ft thickness, the volume is 56 × 2 × 1 = 112 ft³. Using the full outside perimeter of 64 ft with the same width would count the corners twice.

For branches or varying widths, split the plan into non-overlapping rectangles. The calculator sums your entries; it cannot inspect the plan or automatically remove intersections. If you enter one combined net length for several identical runs, use quantity 1 to avoid multiplying those runs again.

Use groups for repeated footings

One group can represent several identical isolated footings. Use another group when the length, width, diameter or thickness changes. Circular isolated footings are modeled as solid cylinders of constant diameter. Break stepped footings into separate non-overlapping blocks; tapered or sloped shapes require a separate takeoff.

Units, allowance and ordering

Each dimension has its own unit selector. Choosing a new unit converts the entered value. The feet/inches and metric buttons convert every group's dimensions. Cubic yards = cubic feet / 27; cubic meters = cubic feet × 0.028316846592.

The 5% allowance is an editable example. Confirm site losses, excavation variation, overbreak and delivery increments with your project team and concrete supplier. Results use unrounded measurements; displayed volumes are rounded to three decimals.

Use the approved footing dimensions

This calculator estimates concrete from supplied dimensions. Footing width, thickness, reinforcement, founding depth and soil bearing requirements come from the project design. Stem walls, columns and pedestals above the footing are separate concrete items; include only the footing bodies here.

References

Related calculators

All calculators

TECHNICAL REVIEWER

Riya Kulkarni | BE Civil Engineer

Riya Kulkarni qualifications and experience
QualificationBE Civil – Shivaji University, Kolhapur (2018)
Experience8+ Years
Technical SpecialisationsStructural Engineering, Construction Materials, Site Execution and Concrete Technology.

Project experience

1. Shree Ganesh Residency

Location: Rajarampuri, Kolhapur

Project Type: G+4 Residential Apartment Building

Technical responsibilities
  • RCC structural construction coordination.
  • Reinforcement and shuttering inspection.
  • Concrete pouring and curing supervision.
  • Monitoring construction materials and workmanship.
  • Site quality-control documentation.

2. Vrindavan Heights

Location: Tarabai Park, Kolhapur

Project Type: G+5 Residential Building

Technical responsibilities
  • Structural drawing interpretation.
  • Reinforcement detailing checks.
  • Concrete workability and placement monitoring.
  • Construction sequencing and site coordination.
  • Building material quality assessment.

3. Sai Krupa Row Houses

Location: Kalamba Road, Kolhapur

Project Type: Residential Row Housing Development

Technical responsibilities
  • Foundation and plinth construction coordination.
  • Brick masonry and plastering inspection.
  • Concrete mixing, placement and curing.
  • Waterproofing and finishing work coordination.
  • Construction progress documentation.

4. Greenview Enclave

Location: Ujalaiwadi, Kolhapur

Project Type: G+3 Residential Apartment Complex

Technical responsibilities
  • Site execution monitoring.
  • RCC work and reinforcement inspection.
  • Construction material management.
  • Concrete quality testing coordination.
  • Workmanship and quality documentation.

5. Lotus Business Plaza

Location: Shahupuri, Kolhapur

Project Type: G+3 Commercial Building

Technical responsibilities
  • Structural construction coordination.
  • Slab and column reinforcement inspection.
  • Concrete placement and quality monitoring.
  • Construction activity sequencing.
  • Contractor and site-team coordination.

6. Omkar Residency

Location: Kadamwadi, Kolhapur

Project Type: G+5 Residential Apartment Building

Technical responsibilities
  • Foundation and superstructure execution coordination.
  • Reinforcement and formwork inspection.
  • Concrete testing and curing monitoring.
  • Material specifications and quality checks.
  • Site inspection reporting.

7. Silver Oak Villas

Location: Kasaba Bawada, Kolhapur

Project Type: Independent Residential Villa Development

Technical responsibilities
  • Residential foundation construction.
  • RCC structural component inspection.
  • Masonry and plastering quality checks.
  • Flooring and finishing coordination.
  • Site execution and material monitoring.

8. Pratham Commercial Complex

Location: Ruikar Colony, Kolhapur

Project Type: Commercial and Retail Building

Technical responsibilities
  • RCC construction coordination.
  • Concrete quality-control procedures.
  • Structural component inspection.
  • Construction material assessment.
  • Execution progress and quality reporting.